PAK Górnictwo sp. z o.o. is a ZE PAK group company based in Konin that ran the KWB Konin mine railway (Koleje Górnicze): an industrial network of some 120 km carrying lignite from the open pits to the Pątnów and Konin power stations. It was here that Poland’s last EL2 electric locomotives, known as Crocodiles, ran until 30 April 2026.
| Full name | PAK Górnictwo sp. z o.o. |
|---|---|
| Seat | Konin, ul. Przemysłowa 158 |
| Registry (KRS) | 0000317814 (registered 19 November 2008) |
| Group | ZE PAK S.A. |
| Main task | mine railway: coal from the KWB Konin pits to the power stations |
| Depot | Kazimierz Biskupi: loco shed, wagon shop, KWg signal box |
| Network (peak) | 120 km of lines, 15 stations, 225 sets of points |
| National network link | Przesmyk-Gaj station |
| Rolling stock | EL2 (1958–2026), TEM2, SM42, 410V and WAP self-discharging wagons |
Key facts
- The KWB Konin mine railway is one of Poland’s largest industrial railways. Legally a private siding, it was the size of a regional network.
- Coal ran from the excavator by conveyor straight into wagons, and trains took it to the unloading trestles at Pątnów and Konin.
- For 68 years, from 1958 to 30 April 2026, its symbol was the EL2 electric locomotive from LEW Hennigsdorf.
- Traffic was controlled from classic relay signal boxes with domino panels.
- PAK Górnictwo sits alongside PAK KWB Konin S.A. (mining) and ZE PAK (power) in one group.
History of the mine railway
Narrow gauge and an aerial ropeway
Before the big railway, coal from the first pit at Morzysław moved by a 500 mm chain-hauled line and an aerial ropeway about 1,382 m long, running along today’s Wyspiańskiego Street in Konin.
1958: standard gauge and the first Crocodiles
The Pątnów pit and Konin power station needed more capacity. The mine built a standard-gauge railway, and in 1958 the first 16 EL2 locomotives arrived. Over the following decades the network grew with the pits: Kazimierz, Jóźwin, Lubstów and Drzewce, serving the Pątnów and Konin power stations.
At its peak
At maturity the network had 120 km of lines, mostly double-track, 15 stations and 225 sets of points. Its backbone was two trunk lines, to Kleczew and to Lubstów, with interchange to the PKP PLK network at Przesmyk-Gaj. Up to 12 shuttle trains of 10 wagons ran, plus three more in winter. There were 3 bridges and 7 viaducts, including steel bridges over the canal between lakes Pątnowskie and Mikorzyńskie.
PAK Górnictwo and the final years
PAK Górnictwo was entered in the court register on 19 November 2008 and runs the mine railway and its depot within the ZE PAK group. As the pits closed, the network shrank. The Tomisławice pit has no rail link, so its coal goes by truck to a loading point and then by rail. On 30 April 2026 EL2 service ended; coal trains are now diesel-hauled.
The EL2 „Crocodile” electric locomotives
The EL2 is a four-axle electric locomotive with a central cab, designed by LEW Hennigsdorf near Berlin for open-pit mines. In the LEW family it sat between the narrow-gauge EL3 and the two-section EL1. It has roof and side pantographs, because at excavators and spoil heaps the wire is hung beside the track rather than above it, so the excavator can load the wagons from above.
| Parameter | EL2 (LEW Hennigsdorf) |
|---|---|
| Builder | LEW Hennigsdorf near Berlin (East Germany) |
| Built | 1953–1988, 1,384 in total |
| In Poland | 62, mainly KWB Konin and KWB Adamów |
| At Konin | from 1958 (first 16) to 30 April 2026 |
| Layout | four axles, central cab, two bogies |
| Hourly rating | 4 × 350 kW |
| Continuous rating | 4 × 290 kW |
| Current collection | roof and side pantographs, for wires hung beside the track at excavators and spoil heaps |
| Operating range | –40 to +35 °C |
Other locomotives and wagons
Alongside the EL2 the railway used diesel locomotives: the TEM2, nicknamed „Tamara”, and the SM42, nicknamed „Stonka” (Colorado beetle). A 401Da locomotive also stood in the shed. Coal travelled in two types of self-discharging wagon, Czech 410V and Polish WAP; our guides showed us how to tell them apart. Andrzej Rudziński wrote about heating these wagons in the journal TTS (11/2009).
Signalling and traffic control
Safe operation relied on classic relay signal boxes with domino-type panels, where the signaller sees the track layout and sets routes. At the small Wa box, hook point locks were still worked by hand. In July 2025 we visited these boxes and their relay rooms:
| Signal box | What we saw |
|---|---|
| KWg (Kazimierz Biskupi) | domino-type panel and relay room by the railway depot |
| Wa (Workshop) | hand-worked hook point locks |
| EW – East Trestle | controls the approach to the unloading trestle |
| Przesmyk-Gaj | interchange with the PKP PLK network |
| Drzewce | box by the former Drzewce pit |
| Lubstów | coal loading area |
The depot at Kazimierz Biskupi
The heart of the railway is the depot at Kazimierz Biskupi. The loco shed handled inspections and repairs of EL2, TEM2 and SM42 locomotives, and in the wagon shop wagons are lifted on jacks. The KWg signal box next door controls traffic in the area.
The people of the mine railway
The longest-serving head of the mine railway, for 19 years, was Andrzej Rudziński. He joined the mine in 1992, became deputy head in 1997 and head in 2007, and retired in 2026 after 34 years. He wrote the study „Koleje Górnicze KWB Konin” (2009), used in this entry. Our guides also included Mirosław Krzymiński and Marek Pilarczyk, with help from Paweł Napieralski.
PAK Górnictwo and Zrobotyzowani
Since 2023 the mine railway has opened its depot, signal boxes and lines to us. We ran three special trips with the Crocodiles; the last, on 18 April 2026, came twelve days before the end of the EL2 era.
| Date | Event | Report |
|---|---|---|
| April 2023 | first day at the Kazimierz Biskupi railway depot | report (PL) |
| 25 May 2024 | „Crocodiles Golden Hour”: two special EL2 coal trains | report |
| autumn 2024 | an autumn walk with the Crocodile | report (PL) |
| 29 March 2025 | loco shed, KWg signal box, wagon shop | report |
| 5 July 2025 | railway signalling: KWg, Wa, EW, Przesmyk-Gaj, Drzewce | report |
| 18 April 2026 | „Last Crocodiles”: our third and final EL2 special | report |
How to see the mine railway
The network is a closed industrial site. Some lines, viaducts and trestles can be seen from public roads around Konin, Kazimierz Biskupi and Kleczew, for example from the viaduct over the regional road near Kazimierz. The depot and signal boxes can only be visited on organised trips approved by the ZE PAK group companies.
Frequently asked questions
What does PAK Górnictwo do?
PAK Górnictwo sp. z o.o. is a ZE PAK group company based in Konin. It ran the mine railway that hauled lignite from the KWB Konin pits to the Pątnów and Konin power stations, together with the rolling-stock depot at Kazimierz Biskupi and the signal boxes.
Why were the EL2 locomotives called Crocodiles?
That is what railwaymen and enthusiasts called them. The EL2 has a long, low body with a central cab and machine rooms at both ends; the green livery and shape bring a crocodile to mind.
When did EL2 service end in Poland?
On 30 April 2026. The EL2 ran in Poland for 68 years, from 1958, and the last ones worked on the KWB Konin mine railway.
How many EL2 locomotives were there in Poland?
Poland received 62 EL2 locomotives, mainly for the Konin and Adamów lignite mines. The first 16 arrived in Konin in 1958.
How big was the Konin mine railway?
At its peak it had 120 km of lines, mostly double-track, 15 stations and 225 sets of points. The main lines were the Kleczew and Lubstów trunk lines, connected to the national PKP PLK network at Przesmyk-Gaj.
What hauls the coal now that the EL2 is gone?
Diesel locomotives such as the TEM2, nicknamed Tamara, and the SM42, nicknamed Stonka. Coal from the Tomisławice pit reaches the wagons by truck.
Can you still see an EL2 Crocodile?
They no longer run on the mine network, and the owner decides what happens to them. We documented the Crocodiles’ last runs in our „Last Crocodiles” report of 18 April 2026.
Sources
- KRS 0000317814 – PAK Górnictwo sp. z o.o. (rejestr.io)
- Wikipedia: LEW EL2, Kopalnia Węgla Brunatnego Konin
- A. Rudziński, „Koleje Górnicze KWB Konin”, 2009; „Ogrzewanie wagonów VAP i 410V”, TTS 11/2009
- Broszura pamiątkowa „Ostatnie Krokodyle” (KWB Konin, 18.04.2026) oraz informacje przewodników Kolei Górniczych podczas wizyt Zrobotyzowanych (2023–2026)