The Tadeusz Sendzimir Steelworks in Kraków-Nowa Huta, formerly the Lenin Steelworks and today ArcelorMittal Poland, Kraków unit, was for decades Poland’s largest integrated steel complex. Its blast furnaces and steel plant have been shut, but a modern hot strip mill still runs here, turning thick steel slabs into strip less than 1.5 mm thick.
| Current name | ArcelorMittal Poland S.A., Kraków unit |
|---|---|
| Former names | Lenin Steelworks (1954–1990), Tadeusz Sendzimir Steelworks (1990–2004), ISPAT Polska Stal, Mittal Steel Poland |
| Construction began | 26 April 1950 |
| Opened | 22 July 1954 (first iron from blast furnace no. 1) |
| Peak | 1970s: about 6.7 million tonnes of steel a year, nearly 40,000 workers |
| Last blast furnace out | 23 November 2019 |
| Hot strip mill | built from 2005, first slab 2007 |
| Mill capacity | about 3.3 million tonnes a year |
| Thinnest strip | about 1.4 mm |
Key facts
- Construction began on 26 April 1950, and the first pig iron was tapped from blast furnace no. 1 on 22 July 1954.
- In the 1970s the plant made about 6.7 million tonnes of steel a year and employed almost 40,000 people.
- The last blast furnace was shut down on 23 November 2019.
- The hot strip mill, opened in 2007, processes about 3.3 million tonnes a year and rolls strip down to about 1.4 mm.
- Today the plant is the Kraków branch of ArcelorMittal Poland.
History
The Nowa Huta combine
The decision to build a huge steelworks near Kraków was taken in the late 1940s. Construction began on 26 April 1950, together with a new town, Nowa Huta. On 22 July 1954 the works were officially opened with the first tapping of iron from blast furnace no. 1. The plant was named after Lenin. In 1955 the open-hearth steel plant and the blooming mill started.
In the 1970s the combine had 12 coke oven batteries, five blast furnaces and both open-hearth and converter steel plants. It produced about 6.7 million tonnes of steel a year and employed nearly 40,000 people.
From Sendzimir to ArcelorMittal
In 1990 the works were renamed after Tadeusz Sendzimir, the Polish engineer and inventor of rolling mills. In the early 1990s the open-hearth plant and three blast furnaces closed, and continuous casting started in 1996. In 2003 Polskie Huty Stali, including Kraków, was bought by LNM, which became part of ArcelorMittal. Since 2007 the plant has been a unit of ArcelorMittal Poland.
In 2019, citing energy prices, the cost of CO₂ allowances and a weaker steel market, the company decided to idle the primary end. The last blast furnace was shut down on 23 November 2019, and in 2024 the coke battery was closed for good.
The hot strip mill
The modern hot strip mill was a condition of the privatisation agreement. Construction started in 2005 and the first slab was reheated in 2007; the old mill was then shut and dismantled. With a second reheating furnace the line now handles about 3.3 million tonnes a year.
Slabs, usually about 25 tonnes each, arrive by rail, among others from Dąbrowa Górnicza. They are heated in walking-beam furnaces to about 1,230°C for 2.5 to 4 hours. A high-pressure water descaler removes the scale, the roughing stand reduces them in 5–7 passes to 30–55 mm, and six finishing stands in tandem roll them down to as little as 1.4 mm before coiling. The coils go to cold rolling, to makers of tubes, sections and structures, and to the automotive and railway industries.
The steelworks and Zrobotyzowani
On 5 December 2025, as part of an educational programme run with ArcelorMittal Poland, we toured the hot strip mill with Rafał Paradowski of ArcelorMittal Poland as our guide. We saw the charging operators’ bridge, the reheating furnaces, descaling, the rolling stands and the coilers.
See also in the Lexicon
Visiting
The plant is a working industrial site and can be entered only with an organised group. From outside, it is worth seeing the historic administrative centre of the combine at ul. Ujastek 1, known as the Doge’s Palace, and the whole of Nowa Huta, built together with the steelworks.
Frequently asked questions
Is the Sendzimir Steelworks still operating?
Yes, but without blast furnaces or a melt shop. A modern hot strip mill still runs, fed with slabs that arrive by rail, including from Dąbrowa Górnicza.
What was the Nowa Huta steelworks called?
Lenin Steelworks from 1954 to 1990, then Tadeusz Sendzimir Steelworks, and after privatisation ISPAT Polska Stal, Mittal Steel Poland and ArcelorMittal Poland.
When was the Kraków blast furnace shut down?
The last blast furnace was shut down on 23 November 2019.
Can I visit the Nowa Huta steelworks?
Only in organised groups. From outside, the Administrative Centre at ul. Ujastek 1, known as the Doge’s Palace, is worth seeing.
Sources
- Wikipedia: Huta im. Tadeusza Sendzimira (kalendarium)
- Informacje przewodnika ArcelorMittal Poland podczas wizyty Zrobotyzowanych w Walcowni Gorącej, 5 grudnia 2025
- Relacja Zrobotyzowanych: Gorąca wycieczka do Walcowni Gorącej ArcelorMittal Poland