ZE PAK S.A. (Zespół Elektrowni Pątnów–Adamów–Konin) is a power group based in Konin that since 1970 has brought together the lignite-fired Pątnów, Konin and Adamów power stations in eastern Greater Poland. The group also includes the KWB Konin mine and the PAK Górnictwo mine railway. ZE PAK is now phasing out coal: only unit 9 at Pątnów still burns lignite, while the company builds solar and wind farms, biomass units and green hydrogen plants.
| Full name | ZE PAK S.A. (formerly Zespół Elektrowni „Pątnów–Adamów–Konin”) |
|---|---|
| Seat | Konin, ul. Kazimierska 45 |
| Founded | 1970 (merger of three power stations) |
| Joint-stock company | since December 1994 |
| Registry (KRS) | 0000021374 |
| Stock exchange | Warsaw Stock Exchange, ticker ZEP |
| Main shareholder | Zygmunt Solorz, indirectly about 66% (per the company) |
| Power stations | Pątnów (I and II), Konin, Adamów (closed 2018) |
| Mines | KWB Konin, KWB Adamów (since 18 July 2012) |
| Website | zepak.com.pl |
Key facts
- According to Wikipedia, ZE PAK’s stations had 1,168 MW in total and produced about 4% of Poland’s electricity.
- The group covered the whole chain: from the KWB Konin pits, via the mine railway, to the boilers and turbines.
- Pątnów has the tallest boiler house in Poland (143 m) and five 150 m chimneys.
- Since 1 January 2025 only unit 9 at Pątnów (474 MW) burns lignite; it is to run until 2030.
- Konin power station runs on biomass and produces green hydrogen.
History of ZE PAK
Three power stations by the mines
The stations were built next to lignite deposits between 1958 and 1974. Konin came first, in the 1950s. Adamów near Turek was built at record speed: work began in September 1960, the first turbine set was synchronised in October 1964 and the fifth in September 1966. The first unit at Pątnów started in 1967; its construction was managed by engineer Józef Zieliński.
1970: the Pątnów–Adamów–Konin group
In 1970 the three stations were merged into the Zespół Elektrowni „Pątnów–Adamów–Konin”. In December 1994 the state enterprise became a joint-stock company wholly owned by the State Treasury. After restructuring, Elektrim became the strategic investor in 1999, and over time Zygmunt Solorz took indirect control.
Pątnów II and the mines
The contract for the new Pątnów II unit was signed in 1996. The site was handed over in July 2005 and the 474 MW unit was synchronised with the grid on 23 November 2007. On 18 July 2012 ZE PAK took over the Konin and Adamów lignite mines, giving the group the whole chain from mining, via rail haulage, to power generation.
Phasing out coal
The last unit at Adamów was shut down on 1 January 2018. At Pątnów I units 3, 4 and 6 went first, and the last two, totalling 444 MW, on 28 December 2024. Since then only unit 9 burns lignite, supplied from the Tomisławice pit of KWB Konin, where mining is due to end in late 2026.
ZE PAK power stations
| Power station | Commissioned | Capacity and fuel | Status (2026) |
|---|---|---|---|
| Konin | 1950s (1958) | biomass units (incl. a new 50 MW unit and boiler K7 converted to biomass), hydrogen electrolyser | runs on biomass |
| Adamów (Turek) | 1964–1966, 5 turbine sets | 600 MW, lignite from KWB Adamów | shut down 1 January 2018 |
| Pątnów I | 1967, 6 units of about 200 MW | about 1,200 MW, lignite from KWB Konin | last units shut down 28 December 2024 |
| Pątnów II (unit 9) | synchronised 23 November 2007 | 474 MW, lignite | group’s last coal unit, planned to run until 2030 |
Pątnów power station
Pątnów lies on the northern outskirts of Konin, by Lake Pątnowskie, and is the group’s largest station. Pątnów I had six units of about 200 MW, with Rafako OP-650b boilers and 13K215 turbines. The Pątnów II unit has a 143 m boiler house, the tallest in Poland. The station has five 150 m chimneys; a taller 200 m chimney was demolished in 2008. Coal arrived by mine railway trains and was tipped from the high unloading trestle seen in the photo.
Konin power station
The group’s oldest station stands in Konin. Instead of lignite it now burns biomass: a new 50 MW biomass unit was built and boiler K7 converted, also for 50 MW. Konin also hosts the group’s first green hydrogen electrolyser, rated at 2.5 MW.
Adamów power station
The station at Turek had 600 MW and burned coal from the Adamów mine. Besides electricity it supplied heat to part of Turek and process steam to the „Miranda” silk works. It was shut down on 1 January 2018.
The ZE PAK group
ZE PAK is the parent company. Coal was mined by PAK KWB Konin S.A. and hauled by PAK Górnictwo; new energy is developed by PAK Polska Czysta Energia (PAK-PCE) and its solar, wind, biogas and hydrogen subsidiaries. PAK Volt sells the energy.
| Link | Company | Entry |
|---|---|---|
| coal mining | PAK KWB Konin S.A. (and KWB Adamów, in liquidation) | KWB Konin |
| rail haulage | PAK Górnictwo sp. z o.o. | PAK Górnictwo |
| power generation | ZE PAK S.A.: Pątnów, Konin (formerly Adamów) | this entry |
| new energy | PAK-PCE (solar, wind, biogas, hydrogen), PAK Volt (energy sales) | – |
Energy transition
At the end of 2020 ZE PAK announced its move away from coal. According to the company, completed projects include the 70 MW Brudzew solar farm (about 155,000 modules on 100 ha), biomass power and heat at Konin and the first hydrogen electrolyser. Plans include 438 MW of onshore wind, about 14 MW of biogas, solar expanded to 250 MW and eventually 1,000 MW, and a second electrolyser. In 2022 cooperation with Korea’s KHNP on plans for a nuclear plant at Pątnów was announced. Unit 9 is to stop burning coal by 2030.
The Konin region is thus taking the road that Bełchatów will soon follow: from lignite basin to renewable energy.
ZE PAK and Zrobotyzowani
We have not toured the power stations inside, but Pątnów was in the background of almost every Konin visit: this is where the EL2-hauled coal trains ended their run. On 18 April 2026, during the „Last Crocodiles” trip, we photographed the station and its unloading trestle from a drone.
Getting there
The Pątnów and Konin power stations lie on Konin’s northern outskirts; the chimneys are visible from far away. The sites are closed, but the lakeshores and public roads give good views.
Frequently asked questions
What does ZE PAK stand for?
ZE PAK is Zespół Elektrowni Pątnów–Adamów–Konin, the Pątnów–Adamów–Konin Power Plant Group, named after three lignite-fired stations merged into one enterprise in 1970.
Who owns ZE PAK?
ZE PAK S.A. is listed on the Warsaw Stock Exchange (ticker ZEP). According to company data cited on Wikipedia, Zygmunt Solorz indirectly controls about 66% of the shares.
Which ZE PAK power stations still run?
Only unit 9 at Pątnów (474 MW) still burns lignite. Konin power station has switched to biomass, Pątnów I was shut down in 2024 and Adamów in 2018.
Where did ZE PAK get its coal?
From the Konin and Adamów lignite mines, part of the group since 18 July 2012. Coal for Pątnów and Konin came by the mine railway run by PAK Górnictwo.
What comes after coal for ZE PAK?
Renewables: the Brudzew solar farm (70 MW, about 155,000 modules), planned wind farms (438 MW), biomass and green hydrogen from electrolysers at Konin. Cooperation with Korea’s KHNP on plans for a nuclear plant at Pątnów has also been announced.
Where is ZE PAK based?
In Konin, at ul. Kazimierska 45.
Sources
- Wikipedia: ZE PAK, Elektrownia Pątnów, Elektrownia Adamów
- ZE PAK S.A.: zepak.com.pl (elektrownie, transformacja, relacje inwestorskie: akcjonariat)
- WNP.pl: Polska elektrownia wyłączyła dwa bloki węglowe; WysokieNapiecie.pl: Elektrownia Pątnów się zwija, został ostatni blok (5.01.2025)
- KRS 0000021374 – ZE PAK S.A.