Date: 22 February 2019 · Location: C7 Młynów station construction site, Wola, Warsaw · Organisers: Koło Miłośników Metra, hosted by Gülermak

Platform hall of Warsaw Metro station C7 Młynów during fit-out, February 2019
The C7 platform hall in February 2019. Photos: Koło Miłośników Metra.

In April 2018 a TBM stood at C7 Młynów. On 22 February 2019, in the same place, track bed was being concreted and rails laid. Nearly 20 members of the Metro Enthusiasts’ Circle (KMM) saw the station less than nine months before the planned completion.

Through entrance W4 to the mezzanine

As usual we started at the information point on Płocka Street: paperwork, safety briefing, boots, vests and helmets. We entered the station from the east and went down the bare concrete stairs of entrance W4 to the mezzanine.

Construction site of metro station C7 Młynów in February 2019
The C7 site. Photos: Koło Miłośników Metra.

Useful destruction

In the future ticket hall we came upon an unusual job: demolishing part of the finished structure. There is only one way to connect an entrance to the station box, by cutting through a section of the diaphragm wall. On the north-eastern side, entrance W3 was being joined in this way, using a remote-controlled hydraulic breaker, a small loader and a few workers.

Remote-controlled breaker demolishing part of the diaphragm wall at Młynów metro station for entrance W3
Breaking through the station wall for entrance W3. Photos: Koło Miłośników Metra.

Then we looked into the technical rooms, where construction was being finished, and took the fixed stairs down to the platform.

Technical rooms of Młynów metro station seen from the eastern mezzanine
Technical rooms seen from the eastern mezzanine. Photos: Koło Miłośników Metra.

Platform and tracks where the TBM stood

The platform slab carried the first sample floor tiles; the ceiling had acoustic panels and cable trays, and similar structures ran along the track-side walls. At the lowest level, where the TBM had stood ten months earlier, there was reinforcement and blocks, track bed was being concreted and rails installed. The same work was going on in the tunnels next to the station.

Entrance W1 and Warszawa Młynów station

On the western mezzanine the wall had already been opened to entrance W1, the most important one for interchange. It is closest to the platforms of the railway stop on the Warsaw ring line. During the modernisation of railway line 20, PKP Polskie Linie Kolejowe renamed that stop from Warszawa Koło to Warszawa Młynów to match the working name of the metro station, long before the metro opened.

Western mezzanine of Młynów metro station with the passage to entrance W1
The western mezzanine, with the passage to entrance W1 behind. Photos: Koło Miłośników Metra.

Level -1.5

Finally, as promised, we visited the western back-of-house area. Some technical rooms here sit between the mezzanine and the platform hall, at level -1.5. Contractor staff took our group photo on the platform, and we returned to the surface via entrance W4.

Technical installations at level -1.5 of metro station C7 Młynów
Technical rooms at level -1.5. Photos: Koło Miłośników Metra.

We thank Gülermak for showing us the works at this stage and for the group photo.

At a glance

Date22 February 2019
SiteC7 Młynów station, line M2
ContractorGülermak
Participantsnearly 20
InterchangeWarszawa Młynów railway stop (formerly Warszawa Koło), line 20

Frequently asked questions

How is an entrance connected to a metro station box?

By cutting through a section of the finished diaphragm wall. At Młynów this was done with a remote-controlled hydraulic breaker.

Why was Warszawa Koło railway stop renamed Warszawa Młynów?

PKP PLK renamed it during the modernisation of line 20 to match the name of the C7 Młynów metro station being built next to it.

What is level -1.5 at Młynów station?

Technical rooms located between the mezzanine and the platform hall in the western part of the station.

Trip report originally published on the website of the Metro Enthusiasts’ Circle (Koło Miłośników Metra) (25 February 2019). Text rewritten and translated by the Zrobotyzowani editorial team. Original Polish report on kmmetra.pl. Photos: Koło Miłośników Metra.