Date: 2023 (the report of 21 June 2023 gives no exact date) · Location: metro: C4 Bemowo – C14 Stadion Narodowy; ZTM headquarters, Grochowska Street, Warsaw · Organisers: Koło Miłośników Metra, hosted by Metro Warszawskie and ZTM Warszawa

Skoda Varsovia metro train at the unused platform of future line M3 at station C14 Stadion Narodowy
The Skoda Varsovia at the future line M3 platform. Photos: Zrobotyzowani / Koło Miłośników Metra.

Participants joked that they were among the first passengers of a line that does not exist yet. In 2023, as part of the tour series “Train control”, the Metro Enthusiasts’ Circle (KMM) rode a train onto the unused platform of future line M3 at station C14 Stadion Narodowy, and then visited the ZTM Traffic Control Centre.

Starting at Bemowo

At 8:45, to some participants’ surprise, we met not at Stadion Narodowy but at station C4 Bemowo. At about 9:15 we boarded a Skoda Varsovia that had just finished its morning-peak passenger runs and was heading out of service for the midday break, to strengthen line M2 in the afternoon peak. First it ran into the sidings beyond Bemowo, where we saw how the train reverses.

Skoda Varsovia metro train at station C4 Bemowo and KMM tour participants before boarding the non-service train (1)
Skoda Varsovia metro train at station C4 Bemowo and KMM tour participants before boarding the non-service train (2)
At Bemowo before setting off on the non-service train. Photos: Zrobotyzowani / Koło Miłośników Metra.

The platform of a line that does not exist yet

Without stopping we ran to C14 and halted at the line M2 platform. After shunting moves with two reversals through the station sidings, we got off at the future line M3 platform. It was built with the rest of the station in 2011–2015, and passengers will not use it for at least several more years. Once we had alighted, the train returned to the sidings.

Unused platform of future Warsaw Metro line M3 at Stadion Narodowy station, participants by the station name board (1)
Unused platform of future Warsaw Metro line M3 at Stadion Narodowy station, participants by the station name board (2)
On the future line M3 platform. Photos: Zrobotyzowani / Koło Miłośników Metra.

On the train and on the platform our Metro Warszawskie guide explained train control in detail. Most interesting was the SOP3 system used daily on line M2. It provides automatic starting and braking of trains. It can also reverse trains automatically at termini, but that function had not yet been used.

With the station supervisor

In the C14 supervisor’s room we learned about the work of the traffic and station supervisor. From time to time traffic is controlled locally: the supervisors at the stations take charge instead of the Central Control Room at Kabaty depot. We also learned what a point clamp is: a device to secure a turnout in the event of a failure. In the entire history of the Warsaw Metro it has been used twice, both times at station A4 Stokłosy.

Tour participants on the stairs at Stadion Narodowy station and in the station supervisor’s room by the monitors (1)
Tour participants on the stairs at Stadion Narodowy station and in the station supervisor’s room by the monitors (2)
On the way to the supervisor’s room, and inside. Photos: Zrobotyzowani / Koło Miłośników Metra.
Supervisor’s panel with emergency lighting lamps, the line M2 platform and two Skoda trains on the sidings at Stadion Narodowy (1)
Supervisor’s panel with emergency lighting lamps, the line M2 platform and two Skoda trains on the sidings at Stadion Narodowy (2)
Supervisor’s panel with emergency lighting lamps, the line M2 platform and two Skoda trains on the sidings at Stadion Narodowy (3)
The supervisor’s panel, the line M2 platform and trains in the sidings. Photos: Zrobotyzowani / Koło Miłośników Metra.

The ZTM Traffic Control Centre

At about 11:40 we took bus 125 to Grochowska Street and the ZTM headquarters, the first place we visited with no direct link to the metro network. Staff of the Service Supervision Department split us into two groups.

The first group went to the Line Information Systems laboratory. Mock-ups of every new display set for buses come here to be tested before they go into vehicles. We learned which passenger-information standards private operators must meet inside and outside their vehicles, how to report a faulty display and how to read the driver’s ID number. We saw how to curtail a trip, run a special working or keep only the termini during traffic changes. The special mode, which lets you enter a non-standard line by hand, was the biggest hit.

ZTM Line Information Systems laboratory and displays reading M3 Koło Miłośników Metra (1)
ZTM Line Information Systems laboratory and displays reading M3 Koło Miłośników Metra (2)
ZTM display laboratory and a test of the special mode. Photos: Zrobotyzowani / Koło Miłośników Metra.

The second group went to the Traffic Control Centre, the heart of Warsaw Public Transport. The head of the Service Supervision Department first showed a clip from the Polish Film Chronicle on how the old municipal transport company dealt with breakdowns and stoppages on the tram network. Then we learned about the supervising dispatcher’s work and how incidents such as accidents, breakdowns or cars blocking tram tracks are resolved. We found out why buses sometimes run in “herds” and what WTP does to minimise it, how heavily even a short metro closure weighs on the whole system, how large the passenger flows are and how long it takes to organise replacement services.

Video wall in the ZTM Warsaw Traffic Control Centre and a metro replacement service board (1)
Video wall in the ZTM Warsaw Traffic Control Centre and a metro replacement service board (2)
The ZTM Traffic Control Centre and a metro replacement service board. Photos: Zrobotyzowani / Koło Miłośników Metra.

We thank Metro Warszawskie for the ride and the account of train control, and the ZTM management and Service Supervision Department staff for permitting the visit and sharing their knowledge.

At a glance

Date2023, report published 21 June 2023 (exact date of the tour not given)
Series“Train control”
RideSkoda Varsovia as a non-service train: C4 Bemowo – sidings – C14 Stadion Narodowy, future line M3 platform
M3 platformbuilt 2011–2015, unused
Control on M2SOP3 system: automatic starting and braking
Point clampused twice in the metro’s history, both times at A4 Stokłosy
ZTMLine Information Systems laboratory and Traffic Control Centre

Frequently asked questions

Is there a line M3 platform at Stadion Narodowy station?

Yes. The second platform of station C14 was built in 2011–2015 for future line M3. In 2023 it was unused and passengers were not expected to use it for at least several years.

What is the SOP3 system in the Warsaw Metro?

The train control system on line M2, providing automatic starting and braking. It can also reverse trains automatically at termini, but that function had not yet been used.

What is a point clamp?

A device to secure a turnout in the event of a failure. In the Warsaw Metro it has been used twice, both times at station A4 Stokłosy.

What is the ZTM Line Information Systems laboratory for?

Mock-ups of every new bus display set are tested there before being installed in vehicles.

Trip report originally published on the website of the Metro Enthusiasts’ Circle (Koło Miłośników Metra) (21 June 2023). Text rewritten and translated by the Zrobotyzowani editorial team. Original Polish report on kmmetra.pl. Photos: Zrobotyzowani / Koło Miłośników Metra.