Date: night of 12–13 February 2023, 23:00 to about 2:30 · Location: metro tunnel C9 Rondo Daszyńskiego – C10 Rondo ONZ – link – A13 Centrum, Warsaw · Organisers: Koło Miłośników Metra and Zrobotyzowani, under the patronage of Metro Warszawskie

Night tour participants in hi-vis vests at the tunnel junction of the link between metro lines M2 and M1
Group photo at the junction of the link tunnels. Photos: Zrobotyzowani / Koło Miłośników Metra.

The last walk like this had been 16 years earlier, so we expected plenty of interest. We did not expect quite this much. On the night of 12–13 February 2023 the Metro Enthusiasts’ Circle (KMM) and Zrobotyzowani launched the “Train control” series with a walk through the tunnel from C9 Rondo Daszyńskiego to A13 Centrum, via the link between lines M2 and M1.

25 places in 23 seconds

We had only 25 places. When registration opened, more than 700 people tried to visit our page, an average of 28 per place, and registration closed in 23 seconds.

TimeWhat happened
23:00meeting on the C9 Rondo Daszyńskiego platform, safety briefing
until approx. 0:30traffic supervisor’s room and technical space above the sidings
approx. 0:30back on the platform before the last train, station cleaning
1:07third rail switched off, off we go
approx. 1:30stop at C10 Rondo ONZ (about 20 minutes’ walk)
approx. 2:20A13 Centrum platform, end of the tour

Before the last train

We met on 12 February at 23:00 on the platform of C9 Rondo Daszyńskiego. After the safety briefing, while waiting for service to end and the power to be switched off, we visited the traffic supervisor’s room and the technical space above the sidings. Our Metro Warszawskie guides answered every question, including what the spaces we saw could be used for.

Night tour participants on the Rondo Daszyńskiego platform, the traffic supervisor’s room and the empty technical space (1)
Night tour participants on the Rondo Daszyńskiego platform, the traffic supervisor’s room and the empty technical space (2)
Night tour participants on the Rondo Daszyńskiego platform, the traffic supervisor’s room and the empty technical space (3)
Meeting at C9, with the traffic supervisor and in the space above the sidings. Photos: Zrobotyzowani / Koło Miłośników Metra.

At about 0:30, just before the last train, we returned to the platform and watched it being cleaned after the station closed. At 1:07 came the announcement that the third rail was off. Green light: we set off.

Rondo Daszyńskiego metro platform after closing and participants in hi-vis vests entering the tunnel (1)
Rondo Daszyńskiego metro platform after closing and participants in hi-vis vests entering the tunnel (2)
The platform after closing, and into the tunnel. Photos: Zrobotyzowani / Koło Miłośników Metra.

Downhill to Rondo ONZ

The walk was easy, as it was downhill nearly all the way. We had to watch our step, though, so as not to damage the equipment that keeps trains running safely. We paused briefly at line ventilation building V10. After about 20 minutes we stepped onto the platform at C10 Rondo ONZ to rest and to let an engineering trolley pass, carrying a gauge frame to station C21 Bródno.

Beyond Rondo ONZ lies a crossover chamber. Track work was under way, so we saw points being thrown up close, setting a different route. It takes just a few seconds.

Metro tunnel at night with the power off and the crossover chamber beyond Rondo ONZ station (1)
Metro tunnel at night with the power off and the crossover chamber beyond Rondo ONZ station (2)
The tunnel at night and the crossover chamber. Photos: Zrobotyzowani / Koło Miłośników Metra.

The link no passenger travels

The highlight was the link. Line M2 does not yet have its own depot, which is still being built, so trains going for inspections and heavier repairs run to Kabaty this way. Passengers do not use the link, so for many of us this was the only way to see it. At the tunnel junction we of course took a group photo.

Group photo of participants in hi-vis vests at the junction of the metro link tunnels
At the junction of the link tunnels. Photos: Zrobotyzowani / Koło Miłośników Metra.

At about 2:20, after seeing the crossover chamber where the link joins line M1, we reached the platform at A13 Centrum. Once the dispatcher was told the tunnel was clear, the same trolley arrived, now without the gauge frame. We had to go home by surface transport, as the first train left only after 5:00.

Tunnel and crossover chamber of the link at station A13 Centrum, with a signal and turnouts (1)
Tunnel and crossover chamber of the link at station A13 Centrum, with a signal and turnouts (2)
Tunnel and crossover chamber of the link at station A13 Centrum, with a signal and turnouts (3)
The link at Centrum: tunnel, signal and turnouts. Photos: Zrobotyzowani / Koło Miłośników Metra.

We thank Metro Warszawskie for making the tour possible, its staff for their answers and for guiding the group safely, and the maintenance teams for the exemplary condition and cleanliness of the infrastructure.

At a glance

Datenight of 12–13 February 2023
Series“Train control”, meeting no. 1
RouteC9 Rondo Daszyńskiego – ventilation building V10 – C10 Rondo ONZ – crossover chamber – link – A13 Centrum
Participants25 (over 700 interested, registration closed in 23 s)
Power off1:07
Previous such walk16 years earlier

Frequently asked questions

What is the link in the Warsaw Metro?

A tunnel connecting line M2 with line M1 at station A13 Centrum. Passengers do not use it; line M2 trains run through it to Kabaty depot for inspections and repairs.

Why do line M2 trains go to Kabaty?

Because line M2 does not yet have its own depot; in 2023 it was still under construction.

When can you walk through a metro tunnel?

Only at night, after service ends and the third rail is switched off, with Metro Warszawskie guides. On this tour the power went off at 1:07.

How long does it take to throw points in the metro?

A few seconds. Participants saw it in the crossover chamber beyond Rondo ONZ station.

Trip report originally published on the website of the Metro Enthusiasts’ Circle (Koło Miłośników Metra) (4 March 2023). Text rewritten and translated by the Zrobotyzowani editorial team. Original Polish report on kmmetra.pl. Photos: Zrobotyzowani / Koło Miłośników Metra.

Privacy Preference Center