Date: 12 June 2019 · Location: C6 Księcia Janusza metro station and sidings construction site, Górczewska Street, Wola, Warsaw · Organisers: Koło Miłośników Metra, hosted by Gülermak

Platform of Warsaw metro station C6 Księcia Janusza in October 2019: green, three-dimensional ceiling above the platform and a metro train at the edge
Station C6 Księcia Janusza four months after our visit, 7 October 2019. The green ceiling we asked about in June is already in place. Photo: Koło Miłośników Metra (Metro Enthusiasts’ Circle).

A week after visiting the eastern end of line M2 it was the western end’s turn. On 12 June 2019 the Metro Enthusiasts’ Circle (KMM) went onto the construction site of station C6 Księcia Janusza for the second time. Work was far enough along that, besides the station, we also saw the huge sidings structure beyond the future terminus.

A station and sidings under Górczewska Street

C6 is the terminus of stage I of the western section of line M2, built beneath the northern carriageway of Górczewska Street at its junction with Księcia Janusza and Jana Olbrachta Streets. West of it, as far as Góralska Street, run the sidings. Completion was expected roughly six months after our visit.

ParameterValue
Station lengthnearly 240 m
Station widthover 22 m
Top of railapprox. 13 m below ground
Sidingsnearly 370 m, up to Góralska Street
Whole structurejust under 610 m long, volume just under 190,000 m³
Entrances9

Before 9:00 we gathered at the gate at the southern end of Księcia Janusza Street. In the site office we completed the formalities, had a safety briefing and were given protective equipment. It was hot, so we took extra water and set off at 9:30.

Through entrance W7 into the technical area

Past the gatehouse we stood at the western end of the site, nearly 400 m long and about 30–60 m wide, picking out the future surface structures: entrances, lifts and ventilation buildings. We went underground through entrance W7, structurally complete. It will be the north-westernmost of the station’s nine entrances.

A corridor of a dozen or so metres led to the western mezzanine. Our guides showed us where the ticket gates and shops would be, but instead of heading to the platform we went the other way, into the technical area. Along a corridor lined with ventilation, power and water and drainage rooms, after about 40 m and two turns, we passed seamlessly into the technical part of the sidings.

The first room we were shown was… a reserve room. There will be plenty of spare space under Górczewska Street. The enthusiasts came up with several uses within a minute, but the decision lies with the city and the metro. Along winding corridors we also reached the ventilation shaft duct for the sidings and two more reserve rooms, then took a staircase down to level -2.

Sidings unlike any other

The structure has the standard width of four tracks but is unusual for three reasons. First, length: each track can hold two trains, and additional turnouts make the structure even longer. Second, an inspection pit: as beyond station C18 Trocka, which we had visited a week earlier, there is provision for servicing trains. Third, the turnouts: the pit at the end of one track and the particular layout called for extra turnouts that make shunting easier.

The staircase brought us out at track level roughly halfway along the sidings. In front of us were those turnouts, or rather their future locations, since the trackbed and cable runs were at different stages in different places. The columns carrying the structure, the service platforms and the walkways between the tracks were finished. Along the northern wall, following track 2, among dozens of workers, scaffolding, formwork and rebar, we reached the last turnouts and the construction opening through which materials and equipment are lowered from the surface.

The western “end of the metro”

Between tracks 1 and 3 we reached the western “end of the metro”. There were no signals or buffer stops yet, but soon trains would reverse here, wait between peaks and overnight, and be repaired on the service track. That track will get its own enclosed room. Its walls and trackbed, different from the other tracks because of the inspection pit, were under construction. We talked with the works manager about construction methods and about what lay above our heads on the surface.

We climbed the westernmost staircase to level -1, intending to return to the station along the technical level. Floor works in one corridor stopped us, so we went back the way we had come to the turnouts, then along the columns between tracks 2 and 4 to the scissors crossover. From there we stepped down to track 1 and onto the service platform.

A black ceiling above a green one

The service platform led us to the western end of the passenger platform. Intensive fit-out was under way, from floor to ceiling. The ceiling already had an acoustic mat with a dark, almost black surface. We asked why, since at the neighbouring station C7 Młynów the acoustic lining is light cream. The answer lies in the interior design: the suspended ceiling above the platform will be green, three-dimensional and partly see-through, and the black above it is meant to give it depth. Even the silver anchors fixing the mat to the concrete were to be painted black.

We walked the length of the platform, looking into the tunnels towards C7, and took a group photo. Up the stairs to the western ticket hall and past entrance W3 we returned to entrance W7. Before we left, the site manager answered our last questions. The visit ended after 10:30.

We thank Gülermak for KMM’s first ever tour of sidings under construction, for showing us round this huge structure, and our guides for the group photo.

The photos from the June tour have not survived. The photo at the top was taken at station C6 on 7 October 2019, four months later.

At a glance

Date12 June 2019
Sitestation C6 Księcia Janusza and sidings, terminus of stage I of the western section of line M2
ContractorGülermak
Stationnearly 240 × over 22 m, rails approx. 13 m below ground, 9 entrances
Sidingsnearly 370 m, 4 tracks of 2 trains each, inspection pit, extra turnouts
Timeapprox. 9:00–10:30

Frequently asked questions

How long are the sidings beyond Księcia Janusza metro station?

Nearly 370 m. They reach Góralska Street, and the whole structure including the station is just under 610 m long.

How do the sidings beyond C6 differ from others in Warsaw?

Each of the four tracks holds two trains, there is an inspection pit for servicing trains, and extra turnouts make shunting easier.

Why was the ceiling above the platform at Księcia Janusza black?

The black acoustic mat was meant to give depth to the green, open-work suspended ceiling designed for the platform.

How many entrances does station C6 Księcia Janusza have?

Nine. Entrance W7 is the north-westernmost.