Date: 10 February 2018 · Location: C17 Targówek station construction site, Ossowskiego / Pratulińska Streets, Warsaw · Organisers: Koło Miłośników Metra, hosted by Astaldi

All 25 places on the tour of the C17 Targówek station site were taken in 2 minutes. On 10 February 2018 the Metro Enthusiasts’ Circle (KMM) walked through every level of the station in shell form and along the crossover chamber to the tunnel portals. The host was Astaldi, contractor for stage I of the eastern-northern section of line M2.
A station under the Ossowskiego / Pratulińska junction
The section is about 3.2 km long with three stations. C17, working name Targówek, is the second and the first in the Targówek district. It lies beneath the junction of Ossowskiego and Pratulińska Streets. North of it, under green space, a crossover chamber is being built so that trains can switch from track 1 to track 2 and back.
| Part of the structure | Length |
|---|---|
| Station | 162.30 m |
| Crossover chamber | 137.64 m |
| Total | 299.94 m |
Before 10:00, 23 people gathered at the gate on Ossowskiego Street. After the paperwork, a safety briefing and the issue of helmets and vests, we went onto the site.

Entrances W2 and W3, and level -1
On the north side of the site the walls of the future entrance W3 and of a lift shaft already rose above ground; the shaft has a round opening for the metro logo, the distinctive “M”. We headed south along a section of Pratulińska Street that had been closed, past workers at entrance W2, and went down a stair tower to level -1.

The first underground level houses the local ventilation rooms. The whole station was nearly complete in shell form. Beyond them opened a large space, the future public area. Two columns support the slab there: the first marks the entrance to the southern ticket hall, the second the line of ticket gates. Behind them are the stairs to the platform.

The platform and the tunnel bored by Maria
At level -2 the concrete platform was covered with tools and components awaiting installation, so we walked along a narrow strip by the eastern edge. From the stairs we could see the portal of the southern tunnel D17. It is 658.552 m long and was bored by TBM S644 Maria between 25 July and 5 September 2017. It links C16 Szwedzka, the last station in Praga-Północ, with C17, the first in Targówek.
A freshly bored tunnel is bare. It still needs walkways, services, track bed, two running rails and the third rail. That work was just starting in all the tunnels of the section.
Below, at level -3, the under-platform level, workers were fitting brackets for cable routes. Once services are installed, they will be hidden behind track-side wall panels. According to the design, the walls and suspended ceiling were to be made of curved elements and the platform hall finished in green.
Beyond the platform: the crossover chamber
After the stairs to the northern mezzanine and the last two columns, the public part ends. Beyond are technical rooms with narrow service platforms on either side. Glazed doors will eventually separate them, but at the time we could walk straight through and down to level -3.

Beyond the station begins the single-level crossover chamber. Preparations for the track bed were under way, but triangular concrete structures showed where the scissors crossover would go. It is needed because seven sidings are being built beyond the neighbouring station C18 Trocka, the future terminus of line M2. Without the crossover, moves to and from the three side sidings would be long and awkward.

At the end of the chamber were the portals of the two D18 tunnels: on the left, the end of the northern tunnel from C18; on the right, the start of the southern tunnel. Fitting-out had begun, so we could not go in, but even from a distance the view was worth it.

We returned the same way. Finally we took group photos with the Church of Christ the King behind us, and by entrance W3 and the lift shaft, the station’s only surface structures north of Ossowskiego Street. We thank Astaldi for the invitation.

At a glance
| Date | 10 February 2018 |
| Site | station C17 Targówek (now Targówek Mieszkaniowy) and crossover chamber, stage I of the eastern-northern section of line M2 |
| Contractor | Astaldi |
| Participants | 23 (25 places taken in 2 minutes) |
| Tunnel D17 (southern) | 658.552 m, TBM S644 Maria, 25 Jul – 5 Sep 2017 |
Frequently asked questions
Why was a crossover chamber built beyond Targówek station?
The scissors crossover shortens and simplifies moves to and from the seven sidings beyond the neighbouring station C18 Trocka, which became the terminus of line M2 when the section opened.
How long is tunnel D17 between Szwedzka and Targówek?
The southern tunnel D17 is 658.552 m long. TBM S644 Maria bored it between 25 July and 5 September 2017.
How long is station C17 Targówek including the crossover chamber?
The station is 162.30 m and the crossover chamber 137.64 m, a total of 299.94 m.
Trip report originally published on the website of the Metro Enthusiasts’ Circle (Koło Miłośników Metra) (11 February 2018). Text rewritten and translated by the Zrobotyzowani editorial team. Original Polish report on kmmetra.pl. Photos: Koło Miłośników Metra.