Date: 12 April 2022 · Location: C20 Kondratowicza metro station, Kondratowicza Street, Targówek, Warsaw · Organisers: Koło Miłośników Metra, hosted by Gülermak

The yellow, orange and red went up on the walls just days before we arrived. On 12 April 2022 the Metro Enthusiasts’ Circle (KMM) made its second large-group visit to the Bródno section of line M2. Gülermak invited us to station C20 Kondratowicza, a few months before completion and almost in its final form.
By metro to the district office
In 2001, after decades of planning, the eastern end of line M2 was routed to Bródno. Even then two stations were planned under Kondratowicza Street, the penultimate one by Malborska Street. Right next to it, at Kondratowicza 20, the Warszawa-Targówek municipal office was built in 1996–1998; since 2002 it has been the Targówek District Office. The final alignment was adopted in 2010. The station by the town hall was designated C20 and, with C19 Zacisze and C21 Bródno, formed stage II of the eastern-northern section, known as the Bródno section.
A December 2014 design competition for the three stations was won by ILF Consulting Engineers Polska, which was commissioned to design them in September 2016. Two months later the station was moved about 60 m east, so that exits reach św. Wincentego Street and space remains for an exit to a stop on the planned tram line to Zielona Białołęka.
| Date | Event |
|---|---|
| 20.06.2018 | building permit for station C20 |
| 28.09.2018 | contract with the Gülermak and Astaldi consortium: PLN 1,397,895,000 gross, 36 months |
| April 2019 | diaphragm wall excavation begins |
| 11.06 and 17.07.2020 | TBMs Maria and Anna arrive |
| 27.07 and 10.10.2020 | TBMs depart onwards |
| August 2020 | station box complete, official name Kondratowicza |
| 23.11.2020 | deadline moved to 24.08.2022 because of the pandemic |
| late February 2021 | platform slab complete |
| 19.09.2021 | open day during Public Transport Days |

A new Kondratowicza Street and striped structures
At 9:45 we met in the car park by the district office, at the main site gate. Everyone received a commemorative entry ticket, then protective gear and a safety briefing in the site office. By the entrance next to the town hall we saw the surface reinstatement. Under the city’s concept from early March, the “new Kondratowicza” is to be green and friendly to pedestrians and cyclists, with stops for buses from Targówek, Praga, Białołęka and Marki right by the entrances. The glazed entrances, lift shafts and ventilation shafts are clad in metal in irregular stripes.

Debut of terrazzo and moving walkways
On level -1 the floor was already paved with stone, and the walls were finished in terrazzo, a first for the Warsaw Metro. Overhead hung a grid ceiling with square opal lights. The escalators were running, work on the lifts was nearly done, and fitters were installing shop fronts and emergency signs.
From the eastern mezzanine we went into the subway under św. Wincentego Street. For now it has two exits, one on each side of the street, but a third can be added if the tram to Zielona Białołęka is built. Along both walls of the corridor are two moving walkways several dozen metres long, another first for our metro. They are meant to ease the walk from the Bródno Canal, especially for older people and those with reduced mobility, and the interchange from the future tram.

Ticket gates with QR readers
In the ticket hall stood newly installed ticket gates, still in protective film, next to yellow emergency telephones and emergency door-release buttons. The 13 stations from Księcia Janusza to Trocka have gates from the Warsaw firm Macro-System. The other 8 stations (Karolin to Ulrychów and Zacisze to Bródno) received, under a September 2020 contract, a new model from Mera Systemy of Grodzisk Mazowiecki. It has a different shape, a large direction display halfway up the front, seals on the meeting edges of the glass paddles and, above all, a QR code reader for tickets from on-board machines and apps. The paper-ticket slot sits next to the code reader at the top of the front panel, while the ticket is collected and the city card read on the top surface.

The station’s brain, heart and lungs
Through a side door we reached the corridor by the toilets, which also leads into the technical area. Builders and metro staff compare a station to a human body: the brain is the control room, the heart the substation powering every system, and the lungs the station and local ventilation plant rooms. We could not enter the substation (room 201) because of work on the raised floor, nor the control room (110), where the voice alarm system was being tested. Instead we were shown local ventilation room 655, which supplies fresh air to the main technical area via an intake combined with the lift shaft at the north-west exit.

Twin lifts and a platform in warm colours
At the south-west exit is a “double” lift: the first time in the Warsaw Metro that two passenger lifts stand side by side. In the western ticket hall, above the stairs to the platform, hangs the control room’s one-way mirror, framed in horizontal metal slats.
The platform hall was what we had been waiting for. The day before, City Hall had announced that installation of the track walls had begun at the Bródno stations. On the south side only the frame for the printed aluminium sheets was in place, but on the north side the first colourful panels already hung, with grey perforated infill at floor and ceiling. ILF invited the graphic artist Piotr Młodożeniec to collaborate. He proposed photographs of the station surroundings turned into irregular black shapes on a white background with patches of colour. The final design comprises 6 panoramas of different parts of Targówek, each 120 m long and 4 m high.
| Station | Track-wall colours |
|---|---|
| C19 Zacisze | shades of green |
| C20 Kondratowicza | yellow, orange, red, in stripes like the surface cladding |
| C21 Bródno | blue and purple |
The track walls have the same construction and dimensions as on the central section of line M2, where they carry a work by Wojciech Fangor. The slatted suspended ceiling, with panels across the tracks and light lines above the platform edges, recalls the oldest stations in Ursynów. Conduits for the station name signs and brackets for departure screens already protruded from the ceiling, the first stone benches stood on the platform, and finishing materials awaited installation, including the acoustic wool that goes behind the track walls.

At about 11:00 we came out by the town hall. We thank Gülermak for the invitation and for showing us the station at such an advanced stage. At the time, according to preliminary and unconfirmed information, the Bródno section could open in September 2022.
At a glance
| Date | 12 April 2022, 9:45–11:00 |
| Site | station C20 Kondratowicza, stage II of the eastern-northern section of line M2 (Bródno section) |
| Contractor | Gülermak (consortium with Astaldi) |
| Design | ILF Consulting Engineers Polska, artwork: Piotr Młodożeniec |
| Contract value | PLN 1,397,895,000 gross |
| Firsts for the metro | terrazzo walls, moving walkways, twin lift |
| Ticket gates | Mera Systemy, with QR code reader |
| Artwork | 6 panoramas of Targówek, each 120 × 4 m |
Frequently asked questions
Who designed the artwork at the Bródno metro stations?
Piotr Młodożeniec, invited by ILF. He created 6 panoramas of different parts of Targówek, each 120 m long and 4 m high. At Kondratowicza yellow, orange and red dominate.
What appeared for the first time in the Warsaw Metro at Kondratowicza?
Terrazzo walls, moving walkways in the subway under św. Wincentego Street, and two passenger lifts side by side.
How do the ticket gates at the new line M2 stations differ?
The Mera Systemy gates have a QR code reader, a large direction display and seals on the glass paddles. They were installed at 8 stations: Karolin to Ulrychów and Zacisze to Bródno.
Why was station C20 moved east?
In 2016 it was moved about 60 m so that exits reach św. Wincentego Street and space remains for an exit to the planned tram to Zielona Białołęka.
Trip report originally published on the website of the Metro Enthusiasts’ Circle (Koło Miłośników Metra) (19 April 2022). Text rewritten and translated by the Zrobotyzowani editorial team. Original Polish report on kmmetra.pl. Photos: Koło Miłośników Metra.